INSTALLATION OF THE CONDENSATE DRAIN
15
Make sure that the condensation water is drained quickly. Keep
the condensation drain clean and remove obstacles that can
prevent normal drainage.
Position the drain pipes without mechanical stress on the drain
connection of the unit.
The condensate drain system must be set up with an adequate
p-trap in order to prevent the infiltration of odours.
COMPLETE INSTALLATION FOR INSTALLING FLOOR
17
Install the cover plate.
FINISHING THE INSTALLATION
19
Remove the cover plate and foil before start up of the unit.
104
16
Always install a plug for cleaning in the lower part of the p-trap in
order to allow quick disassembly.pour water into the condensate
collection pan and check if the liquid is drained properly. Otherwi-
se, check the inclination and look for possible blockages.
18
Cover the enclosure with a plastic foil and wooden cover plate.
During construction, this protection must remain in place.
20
After installation of the subfloor and finished floor: install
the grille
3 cm/m