Samsung NE63A6711SS Manuel D'installation page 6

Masquer les pouces Voir aussi pour NE63A6711SS:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installing a 4-wire power cord
Ground strap
Ground plate
Step 4. Installing the conduit
Figure 1
1"
"
1"
3
8
3
"
3
1
1
2
2
3 wire
4 wire
Knockout surface
Conduit connection plate
Installing a 3-wire conduit
Black
White
Neutral
terminal
Live1
Black
White
Install_NE63A6711_DG68-01359B-01_EN+CFR.indb 5
Install_NE63A6711_DG68-01359B-01_EN+CFR.indb 5
Black
White
Live 1
Black
Ground
White
screw
1
"
1
8
1
"
3
8
"
3
8
"
Aluminum building wire may be used but it must be rated for the correct amperage
Ground
and voltage. Connect the wires as described below.
strap
The wire you use, the location and enclosure of splices, etc., must conform to good
Red
wiring practices and local codes.
1.
Loosen the 3 lower terminal screws from the terminal block.
Live 2
2. Insert the center bare wire (white/neutral) tip through the bottom center terminal
block opening. On certain models, the wire will need to be inserted through the
ground strap opening and then into the bottom center block opening.
3. Insert the two side bare wire tips into the lower left and the lower right terminal
block openings.
Wire tips
4. Tighten the screws until the wire is firmly secured (35 to 50 inch-lbs.). Do not over-
tighten the screws since it could damage the wires.
Red
5. Go to Step 5 on page 6 to continue with the installation.
WARNING
The neutral wire of the supply circuit must be connected
Red
to the neutral terminal located in the lower center of
the terminal block. The power leads must be connected
to the lower left and the lower right terminals of
the terminal block. The 4th grounding lead must be
Neutral
connected to the frame of the range with the ground
terminal
plate and the ground screw.
1.
Remove the 3 lower terminal screws from the
terminal block. Remove the ground screw and
Live 2
ground plate and retain them.
2. Cut and discard the ground strap. Do not discard any
screws.
Red
3. Insert the ground screw into the power cord ground
Ground
wire terminal ring, through the ground plate, and
wire
(Green)
into the frame of the range.
4. Insert the 3 terminal screws (removed earlier)
through each power cord terminal ring and into the
lower terminals of the terminal block. Be certain
that the center wire (white/neutral) is connected
to the center lower position of the terminal block.
Tighten screws securely to the terminal black.
5. Go to Step 5 on page 6 to continue with the
installation.
Remove the conduit connection plate and rotate it as shown
below.
1
"
3
8
The conduit hole (1
1
"
1
8
1.
Prepare the conduit cord as shown in Figure 1.
Figure 2
2. Install the conduit cord as shown in Figure 2.
Ring
For conduit installations, insert the strain relief (not
included) into the conduit hole (1
conduit cord through the body of the strain relief and
Body
fasten the ring. Reinstall the bracket.
CAUTION
You must check voltage after connecting power cord.
Strain relief
Live 1 - Neutral
Live 2 - Neutral
Live 1 - Live 2
5 - English
") must be used.
1
8
"). Then thread the
1
8
120 V
120 V
208 V / 240 V
2021-05-18
2021-05-18
8:48:39
8:48:39

Publicité

Table des Matières
loading

Table des Matières