Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

installation
EN
3.3

framing

Prepare rough in framing following the recommended dimensions in Figure 1. For the corner rough in framing,
follow the recommended dimension in Figure 2.
Select a location that is not prone to moisture and is located at least 36" (91.4cm) away from combustible
materials such as curtain drapes, furniture, bedding, paper etc.
Fig. 1
A
A.
Once the rough opening has been prepared, and the power has been routed to the right side of the
recess, the appliance may be installed.
B.
The electrical connection must be made prior to placing the appliance into position (see "hard-wiring
installation" section).
10
W415-1454 / G / 04.01.19
FLOOR
(Or mantel base thickness)
F
B
Rough Framing
NEFB24H
9"
A
(229mm)
23"
B
(58.4cm)
17 1/4"
C
(43.8cm) + F
41"
J
(104.1cm)
29"
K
(73.6cm)
Fig. 2
J
C
Rough Framing in a Corner
NEFB27H
NEFB29H
10"
10"
(254mm)
(254mm)
26"
28"
(66cm)
(71.1cm)
18 1/4"
19 3/4"
(46.3cm) + F
(50.2cm) + F
44"
46"
(111.8cm)
(116.8cm)
31 1/2"
32 1/2"
(80cm)
(82.6cm)
K
L
B

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Cinema nefb24hCinema nefb27hCinema nefb29hCinema insert nefb24hCinema insert nefb27hCinema insert nefb29h

Table des Matières