Devon & Devon Empire Instructions De Montage page 14

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 26
3)
Lean the structure you have just assembled against the wall. Use
a level to check that the structure is positioned correctly in both a
parallel and perpendicular position to the wall.
4)
Mark the position of the holes to fasten the bosses to the wall that
are at the end of the arms of the legs and those at the ends of the
arms of the legs at the end of the towel rail. Also mark the two wall
fastening holes in the rear part of the top.*
WARNING:
during this step and the
following ones for marking
the position of the fastening
holes, in view of the weight
of the top, take particular
care when handling to
prevent it from falling.
The
operators is advisable.
*The screws and rawlplugs are not
supplied for these two holes.
15
presence
of
3

Publicité

Table des Matières
loading

Produits Connexes pour Devon & Devon Empire

Table des Matières