NEVER LEAVE THE HEATER
UNATTENDED WHILE BURNING!
2. ASSEMBLY
For KFA50DGD/80DGD Models only
(Assembly time for this product is 3 minutes)
Tools Required
• Medium Phillips Screwdriver.
1) Lift front guard for arrow direction and make
hole on the upper housing.
2) Remove the pre-assembled screws on the shell
upper.
3) Align the holes in the upper housing with two
mounting holes on the handle as shown in
Figure 6.
4) Secure handle with the screws removed.
For KFA135DGD/180DGD/220DGD Models only (Assembly time for this product is 10 minutes)
Tools Required
• Medium Phillips Screwdriver.
• 3/4 inch socket or adjustable wrench
Assembling Handle & Wheel and Cord Wrap
1) Slide threaded axle through the rear section of the wheel support frame.
2) Slide one axle bushing on to each side of the axle. Slide one wheel on to each side of the axle.
Attach one cap nut on to each side of the threaded axle and tighten well.
3)
frame.
4)
5) Align the hole on the handles with the mounting hole on the Cord Wrap.
6)
Handle
Remove Screws
Figure 6. Assembling Handle
5
Screw
Front Guard
Wedged Portion
Slit Hole
Shell Upper