3-1 Preparation and Caution before Measurement
1. Allow at least 60 seconds after switching on before taking measurements.
2. When the function switch selector is changed during measurement, be sure to do so only after removing the
test
leads from the equipment.
3. If the equipment is used near noise generating equipment, be aware that the display may become unstable or
indicate large errors.
3-2 Voltage Measurements
1. Connect the red test probe to the "V-
2. Set the function switch to " V%, V' " position.
3. Press the blue key to the ACV or DCV function.
4. Connect the test probe and lead to the device to be measured.
è
" input terminal and the black test lead to the "COM" terminal.
14