Installation; Connect Verification Plug - KERN KIB-A12 Manuel D'utilisation

Masquer les pouces Voir aussi pour KIB-A12:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1 Installation

• Connect the verification plug to the KIB-TM display device as follows and then
adjust the weighing system. Once it has been successfully adjusted, the
display device is linked to the verification plug.

1.1 Connect verification plug

Connect the chip in the verification plug to CN7 (5 Pin) in the display device.
KIB-TM
Line colour
Main circuit
board
E+ / Sen+
Red
S+
Green
GND
Shield
S-
White
E- / Sen-
Black
Identchip
Line colour
main board
IC GND
Yellow
IC signal
Brown
KIB-A12-IA-e-1910
Connect female
Connect male
1
1
3
3
5
5
4
4
2
2
Connect female
Connect male
7
7: Identchip GND
6
6: Identchip signal
Load cell
EXC+
SIG+
GND
SIG-
EXC-
Open housing
3

Publicité

Table des Matières
loading

Table des Matières