dirna Bergstrom SCANIA PGR bycool DINAMIC 1.1 Instructions De Montage page 22

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 34
DINAMIC 1.1
EN
®
Pass the wastewater pipe through the bore of
9
9
the evaporator base and connect to the tray.
9
Pass the cabling to the outside through the
10
10
Ø35 upholstery borehole and the Ø48 metal
borehole, using the evaporator couplings.
Position the supplied bushing.
11
11
Position the seal and cable run.
12
12
22

Publicité

Table des Matières
loading

Table des Matières