Horizontal Or Ceiling Installation (Sl,Sli); Mounting Front Grill Safety Support (Sl) - Innova Air Leaf SL Série Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
2.6
Horizontal or ceiling installation (SL, SLI)
Using the paper template, trace on the ceiling the position
of the two fixing brackets and the two rear screws. Using a
suitable drill, make the holes and insert the toggle bolts (2
for each bracket); fix the two brackets. Do not over-tighten
the screws. Position the machine on the two brackets,
keeping it in position and then fix the two screws into the
rear toggle bolts, one on each side.
Make sure that there is sufficient inclination of the unit
towards the drainage pipe to facilitate the water drainage.
Fully tighten all 6 fixing screws.
A
toggle bolts
B
brackets
1÷2°
2.7

Mounting front grill safety support (SL)

In the case in which the cooler-convector is installed in a
horizontal position, to guarantee the safety of the cleaning/
filter replacement operations it is obligatory that the two
clamps, in the supplied bag together with the instruction
manual and the accessories, are mounted by the installer.
Install braces to prevent the fall of the grid.
A
Ties
B
Screws fixing springs
A
10
A
B
A
D
B
C
For installation of the SL versions, horizontal condensation
collection basin accessory kits are available GB0520/
GB0524.
The installation of RS, RSI, SLS units in horizontal position
is prohibited.
Carefully check the inclination of the exhaust pipe.
Any counterslope of the discharge line can cause
water leakage
C
screws
D
drainage pipe
B
C
-
Separate the two clamps;
-
open the front grill and completely unscrew the fixing
screws on the springs;
-
fix the two clamps, blocking them by retightening the
screws;
-
fix the other part of the clamp to the grill using the
supplied screw;
-
close the grill.
C
grid
A
U
I
S

Publicité

Chapitres

Table des Matières
loading

Produits Connexes pour Innova Air Leaf SL Série

Table des Matières