Power Supplies Hls Ps Series Installation; Checking The Hls Ps Series For Damage - Honeywell HLS PS Série Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

HLS PS25 & HLS PS50 User Manual
1. POWER SUPPLIES HLS PS SERIES
INSTALLATION
The HLS PS Series is easy to install providing the
recommended procedures described in this manual are
followed.
Follow all installation instructions described in this
manual. Theses instructions must be understood and
followed to avoid damage to the S Series and
associated equipment.

Checking the HLS PS Series for damage

Before attempting to install your power supply you should
do the following.
The procedure describe bellow tells you what to do in the
unlikely event that the supplied equipment has been
damaged after leaving the factory. However, if you have
problems regarding the quality of any supplied order items,
follow the procedure bellow:
1. If, after removing the HLS PS Series, a visual inspection
reveals that it has been damaged, you MUST NOT
continue with the installation but contact you supplier for
advice on what to do next.
Similarly, if the product is found to be faulty during
installation, contact your supplier immediately.
2. To aid your supplier, you are requested to note all the
details relevant to your complaint, clearly stating details of
any technical problems, date of receipt, packaging
condition, etc. and forward this to your supplier.
3. Where the product needs to be returned to your
supplier, you are requested to use the original packaging
wherever possible .
WARNING
The building where the device is connected should have
surge and earth protections and these should be easily
accessible in order to disconnect the unit from mains by its
two poles.
18
HW_MN-DT-1305_C

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hlsps25Hlsps50

Table des Matières