Notes for the installer
To avoid the possibility of frost damage on
no account install the machine in a room
which is exposed to frost.
It is essential that the machine is installed
level, and is secured (see installation
diagram supplied).
Plumbing
Connection must be made to the water
supply via an on-site stopcock, which
conforms with local and national regulations.
This work must be carried out by an
authorized competent person.
See the installation diagram supplied for
instructions on connection to the water
supply and drainage.
Electrical connection
All electrical work must be carried out by a
suitably competent person in compliance
with national and local regulations. The
washer extractor and WRG water recycling
unit must be installed by an approved
service engineer or authorised service
dealer.
Please take note of the Installation Diagram
and instructions supplied.
Any removable outer panels must be in
place, and all moving or electrical parts
shielded before the machine is operated.
M.-Nr. 07 110 850
13