Installation Instructions - Vision TM-CC TECHMOUNT Guide De L'utilisateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 7

INSTALLATION INSTRUCTIONS

1. Fix ceiling plate assembly to ceiling. M10 bolts and plastic plugs are included for
attachment to masonry. For wood, concrete, and steel use appropriate fixings.
2. On the ground attach spider assembly to bottom of projector.
3. Take projector/spider assembly up ladder and attach to ceiling plate assembly using
2 x M8 pin-hex bolts provided.
4. Fix fall-arrest tether to the 'Top U' part and projector. Adjust tilt of projector, then
tighten all bolts.
3

Publicité

Table des Matières
loading

Table des Matières