Installation; Mounting In The Niche; Projector Protection - ccei BRIO ZX30 Notice Technique

Masquer les pouces Voir aussi pour BRIO ZX30:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
Technical instructions

6. Installation

The BRIO ZX30 are installed instead of the 300W incandescent bulbs in most of swimming pool niches (in
PAR56 format) once the electrical connection is done (on projector side).
1. Mount the 4 fixing tabs (ABS or stainless steel) (A) with the 4 screws. They are placed behind the light
and cross the nut in the heatsink. Avoid to overtighten the screws, it may damage the light.
2. Put the bezel on (B). Avoid to overtighten the screws, it may damage the light
Nova / Bahia : use the supplied screws with the bezel to fix it. The screws pass through the optical unit
by the front of the light. Use the holes highlighted with C
3. You can adapt the stainless steel brackets to the niche by speading them.

6.1. Mounting in the niche

Pass the cable through the niche's cable gland then pull it through the electrical sheath. Be sure that there is
enough cable to remove the light from the niche !
Press the light into the niche after winding the cable.

7. Projector Protection

Independent protection is necessary for each BRIO ZX30 . Protection must be ensured in the secondary of
the transformer using fuses or breakers at .
BRIO ZX30
v40ML
4

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Pk10r007

Table des Matières