Zephyr Siena Pro ZSP-E36BS Guide D'utilisation, D'entretien Et D'installation page 11

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

!
CAUTION: At least two installers are
required due to the weight and size of the
hood.
1. Measure from range top to hood bottom and mark line A.
2. Plum and mark center line.
4. Mark mounting spread from C/L on line B 14-15/16"
screws all the way. Note: wood blocking may need to
be added behind the drywall if no studs are present.
Wall anchors may also be used but check local codes
for compliance. Failure to use suitable wall anchors
and screws to hold the weight of the hood could result
in personal injury or damage to cooking surface or
counter.
6. Install 10" round duct collar with backdraft damper to top of
the last 4 x 38 screws to further secure the hood to the wall
8. Center and attach duct cover bracket to wall below ceiling
9.
Position electrical outlet within the space covered by the
telescopic duct covers and where it will not interfere with
10. Install duct work and duct tape.
11. Power up hood and check for leaks around duct tape.
12. Place telescopic duct covers onto hood and extend inner
!
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
C/L
14-15/16"
B
1-3/8"
C
13"
C/L
2
H O O D
C E N T E
R L IN E
FIG. B
9
Duct Cover Bracket
12-1/8"
A
24" min
1
FIG. A
4 ¼ "
M A X .
2 4 "
M A X .
1 2 "

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Siena pro zsp-e42bsSiena pro zsp-e48bs

Table des Matières