Wieland A-BM-S1-4EKL 5 s Mode D'emploi page 12

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 13
Installation
Place the device on the mounting rail.
Attention
Ensure that grounding spring is in the correct
position. The grounding spring on the module
must make a secure and electrically conductive
connection with the mounting rail.
Dismantling
Remove the plug-in terminals, wiring and end
clamps.
Cover - Dismantling
Subject to changes
Headquarter:
Wieland Electric GmbH
Brennerstraße 10 - 14
D-96052 Bamberg
12
Snap the module onto the mounting rail by
pressing gently in the direction of the arrow.
Attention
If there are several modules, push them apart
one at a time in the direction of the arrow until
the connectors at the sides disengage.
Sales and Marketing Center:
Wieland Electric GmbH
Benzstraße 9
D-96052 Bamberg
If there are several modules, push them together
one at a time in the direction of the arrow until
the connectors at the sides engage and then
install the end clamps at the left and right ends.
Push down at the back.
While pressing down, remove the module from
the mounting rail in the direction of the arrow.
Phone +49 (0) 9 51/93 24-0
Fax +49 (0) 9 51/93 24-198
Technical Hotline +49 (0) 9 51/93 24-995
www.wieland-electric.com
info@wieland-electric.com

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

A-bm-s1-4ekl 50 sA-bm-s1-4ekl 5 min

Table des Matières