Télécharger Imprimer la page

Storing The Ups And The Battery Box; Preparing For Installation; Preliminary Information - ALLTRONIC SEMIS T33 Manuel D'installation Et D'utilisation

Masquer les pouces Voir aussi pour SEMIS T33:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

ALL THE OPERATIONS DESCRIBED IN THIS SECTION ARE TO BE PERFORMED EXCLUSIVELY BY
QUALIFIED STAFF.
The company declines all liability for damage caused by incorrect connections or operations not
described in this manual.
S
UPS
TORING THE
P
REPARING FOR INSTALLATION
P
I
RELIMINARY
NFORMATION
UPS models
Rated power
Working temperature
Max. relative humidity during operation
Max. height of installation
W x D x H
Weight (w/ batteries)
Power dissipated at rated resistive load
(pf=0.9) and with battery as buffer *
INSTALLATION
B
AND THE
ATTERY
SR
SR
SR
SR
B
OX
10 kVA
12 kVA
15 kVA
20 kVA

Publicité

loading