dirna Bergstrom bycool green line COMPACT 1.4 Instructions De Montage page 23

Masquer les pouces Voir aussi pour bycool green line COMPACT 1.4:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

COMPACT 1.4
Position the console using the screws and align
12
the unit in the most ideal position, ensuring the
original screws are in position.
Fasten supports tightening nuts until outside
13
EPDM joint of equipment is compressed,
between 3 and 6 mm.
Important: To avoid water from filtering inside
cabin, check EPDM joint tightening with
Compact base, as indicated on diagram.
3-6mm.
Cabin roof
Fasten selflocked nut until
EPDM gasket is
compressed between 3 and
13
6 mm.
Tighten (4) M8 nuts to support and (4) to Unit
14
base.
EPDM gasket
10 mm*
(*) (approx. after tightening)
12
Base
Bracket
23
Check compression
thickness using a
tape measure in the
four corners.
EPDM gasket
EN
®
13
14

Publicité

Table des Matières
loading

Table des Matières