Maintenance; Introduction; Removing The Boiler Cladding; Boiler Internal Parts - Cola DOMUSFIRE C29 HR Manuel D'installation

Chaudière à granulés
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6

MAINTENANCE

6.1 Introduction

Operations on the internal parts of the boiler must be carried out by qualified personnel. Contact the nearest
authorised service centre.
Make sure the boiler is unplugged and cold before carrying out any work on it.

6.2 Removing the boiler cladding

Key:
1- Pellet hopper door
2- Central middle covers
3- Side panel
4- Front cover
5- Insulated outer door
6- Rear panel

6.3 Boiler internal parts

Key:
1- Knob with threaded rod
2- Turbulator-shaker device extension pin
3- Bush locking nut
4- Pin sliding bush
5- Outer cover
6- Upper thermal protection
7- Middle protection
8- Vermiculite upper protection
9- Vermiculite side protection
10-Chamber outer thermal protection
11-Protection support cover
12-Turbulator support
13-Turbulators
14-Fire door
15-Safety valve
16-Ash door
17-Ash box
18-Heating chamber
65
DOMUSFIRE C29-C35-C39 HR

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Domusfire c35 hrDomusfire c39 hr

Table des Matières