Télécharger Imprimer la page

Pontec PondoSolar 250 Control Notice D'emploi page 11

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 14
Commissioning/start-up
How to proceed:
The rechargeable battery of the unit is not charged. Expose the unit to sunlight for one day before using it for the first
time. Then use the remote control to operate the device.
Solar module: Connections and labelling
Description
1
LED display for the rechargeable battery capacity
2
LED lighting connection socket
3
Pump connection socket
Remote control
 D
The remote control has a range of max. 10 m.
Description
A
Determines the pump operating time (max. 4 h).
− To overwrite the current setting, switch off the pump
with key D and then set the new pump operating time
with key A. The pump will then start up automatically.
B
Switches the LEDs on and off (they are only lit when it is
dark)
C
For setting the flow rate of the pump (5 stages)
D
For switching the pump on and off
Function
LED is lit green: The battery is charged.
− Possible pump operating time: 4 to 6 hours
LED is lit orange: The battery is half discharged.
− Possible pump operating time: 2 to 3 hours
LED is lit red: The battery is nearly empty and needs to be charged.
− Possible pump operating time: less than 1 hour
LED off: The battery is discharged beyond the limit.
− The pump and LED lighting are switched off.
Function
Press the key slowly 1 ×. The LED flashes according to the
newly set pump operating time.
− Example: Desired pump operating time 3 h.
Press the key A 3 × slowly. The LED flashes 3 × several
times in a row.
Press the key briefly.
Press the key slowly 1 × for each stage.
Press the key briefly.
- EN -
PSO0045
11

Publicité

loading