Install Rooftop Box - Furrion FSFP50MAT-BL Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4. Seal around edges of all Z-Brackets and screws where they come in contact with or
penetrate the mounting surface.
NOTE: Make sure that self-leveling silicon adhesive is applied evenly around all edges of
bracket and the mounting screws with no gaps.

Install Rooftop Box

1. Drill a small pilot hole on the chosen location, if desired. Enlarge the pilot hole with a suitable
drill bit. The hole drilled must be large enough for cables to drop through.
2. File and remove any sharp edges around the hole that were created during drilling.
Thoroughly clean the mounting area to ensure proper sealant bonding.
3. Insert positive/negative PV wires from the solar panel junction box into the threaded strain
relief holes on the Rooftop Box.
4. Attach the positive/negative PV wires ("+" and "-" on the tape at the end) inside of the
Rooftop Box to the wires connected to the PWM controller using twist-on wire connectors/
Marrettes (not included).
5. Use standard #8 RV button head screws (not included) to fasten the Rooftop Box to the RV
roof by drilling through the 3 screw holes around the perimeter of the Rooftop Box base.
12

Publicité

Table des Matières
loading

Table des Matières