Before Initial Use; Checking The Chamber And Delivery Scope; Basic Cleaning; Assembling The Chamber - empasa COLOMBIA Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Before initial use

The stated minimum room volumes in relation to a set-up room air change have been
calculated using a stochiometrically calculated maximum CO2 content.
Before initial use

Checking the chamber and delivery scope

1. Remove the chamber from the packaging.
2. Remove the label from or out of the combustion chamber
3. Check whether the shipment is complete (see delivery scope page 4).
4. Check whether the chamber or components are damaged. If this is the case, do
not use the chamber. Contact the manufacturer via the service address given
on the warranty card.

Basic cleaning

1. Remove the packaging material and all protective foil.
2. Before initial use, clean all chamber parts with a dry cloth.

Assembling the chamber

WARNING!
Risk of injury and fire!
Incorrect set-up of the chamber may lead to serious injuries or fire.
- Make sure that the chamber is set up on a secure and horizontal stand.
- Check the secure and horizontal stand by pressing the unit onto the set-up surface
before initial use.
1. Mark the drill holes.
2. Pre-drill the marked positions.
3. Insert the dowels, put in the screws.
3. Insert the safety container
4. Insert the combustion chamber
5. Mount the chamber. Arrange on the screw head, then slide it up,
then slide it to the right, then place the chamber. (see also picture on Page 11)
EP01153
2
.
5
.
10
5
.
V1/2017

Publicité

Table des Matières
loading

Table des Matières