6.3 PREPARATION FOR THE INSTALLATION
1
Before installing it is necessary to mount the fixing supports. Open the accessories box and
take out the 4 brackets and relevant screws. Place the brackets on the 4 holes and fix them
2
with the screws (Fig. 4). Fix the electric box with the screws (Fig. 4a).
3
4
5
Fig. 4
6
6.3.1 ANTI-VIBRATION MOUNTS
7
The use of anti-vibration mounts and M8 threaded rods is suggested during installation
phase, as shown in the picture.
8
9
10
+
6.3.2 MOUNTING THE YEFB UNIT
After having completed the phase «Preparation for installation», the unit has to be turned
upside down on its pallet.
For the ceiling mounting of the unit, use a forklift in order to assure correct and safe
positioning during the fixing operations.
Enclosure 2 shows the dimensions for the fixing and connection of the unit to the system.
30
Fig. 4a
LEGEND
1.
Anti-vibration
2.
Threated rod
3.
Fixing support