Télécharger Imprimer la page

ACD PRESTIGE MS1L Série Mode D'emploi page 14

Publicité

Les langues disponibles

Les langues disponibles

Sidewall + placeholder bolts
Placeholder bolts are used during the entire assembly.
*detail 5 : 7 windows : 1 placeholder bolt
8, 9, 10 or 11 windows: 2 placeholder
bolts
12 windows: 3 placeholder bolts
*detail 6 : an additional placeholder bolt is placed in the glazing bar
7 windows: 1 glazing bar with additional placeholder bolt
8, 9, 10 or 11 windows: 2 glazing bars with additional placeholder bolt
12 windows: 3 glazing bars with additional placeholder bolt
You can find what glazing bars require placeholder bolts on p. 22.
Place one placeholder bolt per profile. Attach the glazing bars, with an M6x16 bolt at the bottom.
Assembly
Slide the panels together to the end, the placeholder bolts are immediately inserted and definitively tightened.
Roof
First place profile A atop the 2 façades and attach it definitively using the provided placeholder bolts.
Attach the B profiles to profile A in the corner and then to the gutter.
Profile in roof
For wall greenhouses smaller than 9 windows, only 2 placeholder bolts have to be provided instead of 3 (detail 2). First attach profile A to the 2 L
profiles of the façades. Attach the 2 supports in between profile A and the glazing bars with the 2 outer placeholder bolts.
Preparation of Glass
Place the construction in its final location, after the installation of the glass the construction becomes cumbersome and difficult to move. For
ease of glass installation, place the construction squared and levelled.
Squared by measuring from corner to corner in both directions, and equalizing both.
Levelled by bringing the 4 corners of the construction to the same level.
Definitively attach the greenhouse to the wall.
K

Publicité

loading