Check List - INFOSEC UPS SYSTEM R2 Pro Notice D'utilisation

Regulateur de tension automatique
Masquer les pouces Voir aussi pour R2 Pro:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7 . I N S T A L L A T I O N A N D O P E R A T I O N
1. Inspection: inspect the AVR upon receipt. The packaging is recyclable. Save it for reuse
or dispose of it properly.
2. Make sure that the AVR do not have any mechanical damages
3. Plug in the AVR to 220VAC mains electricity source
4. If necessary perform grounding of the casing of the AVR by connecting grounding wire to
the corresponding terminal, or at least make sure that the mains outlet is grounded and
available with 3 pins connection.
5. To connect the R2 Pro, switch to ON position. To disconnect it switch to OFF position.
6. Plug the loads into the output sockets of the AVR.
8 . T R O U B L E S H O O T I N G
Should the AVR fail to function correctly we recommend you perform the following tests
before calling the Hot Line.

Check list:

 Is the main switch in the "ON" position?
 Is the AVR plugged into the mains power supply?
 Does the power supply fall within specified unit values?
 Is the AVR overloaded?
INFOSEC UPS SYSTEM – 15, rue du Moulin - 44880 Sautron - FRANCE - www.infosec-ups.com
Hot Line – Tel + 33 (0)2 40 76 15 82 - Fax + 33 (0)2 40 94 29 51 - hotline@infosec.fr – 11 16 AA XX 203 01
7

Publicité

Table des Matières
loading

Table des Matières