This device complies with Industry Canada licence-exempt RSS standard(s). Operation is subject to the following two conditions: (1) this device may not cause interference, and (2) this device must accept any interference, including interference that may cause undesired operation of the device. CAN ICES-3 (A) / NMB-3 (A) SmartDC Guide d'installation | Installation Guide...
896 mm (35.27 in) CoG (approx) 25 mm (1 in) 940 mm (37 in) 58 mm (-2 in) * Illustré avec un Système de rappel des câbles (optionnel) Shown with optional cable management system installed SmartDC Guide d'installation | Installation Guide...
H : Base cover I : Entrée d'aération I : Air intake J : Système de rappel des câbles J : Cable management system K : Échangeur de chaleur K : Heat exchange unit SmartDC Guide d'installation | Installation Guide...
C : Interrupteur de porte C : Door switch D : Modules de conversion AC/DC D : AC/DC conversion modules E : Bornier de branchement de la mise à la terre E : Grounding terminal SmartDC Guide d'installation | Installation Guide...
Page 9
A : Cabinet de branchement au réseau, de mesurage et de distribution B : Câble d’alimentation (3 phases 480 Y/277 volts @ 100 A ou 200 A + NEUTRE + MALT) C : Borne SmartDC D : Sectionneur principal (doit être visible de la borne) E : Espace de stationnement pour véhicule électrique...
Page 10
NOTE: Wiring conduit must be sealed to prevent moisture ingress IMPORTANT: A clearance of at least 16 inches (406mm) must be maintained between the enclosure's back and a rear facing wall or any vertical obstacle. SmartDC Guide d'installation | Installation Guide...
Page 11
2 . Drill holes in the concrete slab of diameter and depth appropriate for the anchors, according to the base’s mounting holes, as illustrated. 3. Once the holes are drilled, place the base and screw in the anchors. SmartDC Guide d'installation | Installation Guide...
Levage de la borne Lifting and handling of the station NOTE: Exemple de levage adéquat Example of an appropriate lifting technique SmartDC Guide d'installation | Installation Guide...
3. Punch a hole in the access plate of an appropriate diameter for the cable connector. 4. Install the cable connector onto the access plate. 5. Insert the power cable into the cable connector. 6. Put the access plate back in place. SmartDC Guide d'installation | Installation Guide...
IMPORTANT: DO NOT remove the rubber stoppers from the aluminum plate, since this may result in damage to the charging station. SmartDC Guide d'installation | Installation Guide...
1. Align the panel with the 4 holes on top of the charging station. 2. Screw the 4 bolts to secure the panel. NOTE: If there are any issues while installing the Top Sign, please contact AddEnergie support. SmartDC Guide d'installation | Installation Guide...
1. Connect the three phase-conductors and the neutral conductor into the power terminal with a torque of 56.5 N-m (500 Lb-In). 2. Connect the GROUND into the grounding terminal with a torque of 5,6 N-m (50 Lb-In). NOTE: Connectors are compatible with copper and aluminum wire. SmartDC Guide d'installation | Installation Guide...
2 . The station will then attempt to communicate with the AddÉnergie servers. 3. Once the station and gateway are powered on, please communicate with the technical support of AddÉnergie to complete the configuration: (877) 505-2674 ext. 203. SmartDC Guide d'installation | Installation Guide...
We recommend that you increase the frequency of station maintenance to 4 times a year in the following situations: • When the station is installed in a dusty area. • When the station’s average cumulative use exceeds 3 hours of charging per day. SmartDC Guide d'installation | Installation Guide...