HALFEN HSC
Mounting positions
Stud heads can be aligned horizontal-
ly or vertically. To ensure installation
of the (male) connecting bars, mini-
mum spacing has to be maintained
(not necessary for monolithic compo-
nents). The engineer's specifi cations
are obligatory.
Variation 1: anchor-heads
aligned in one plane
Min. distances to ensure installation (male bars)
d
[mm]
HSC
12
16
20
25
(Concrete cover)
The engineers specifi cations (installation position, concrete cover etc.) have to be observed
© 2013 HALFEN · INST_HSC 06/13 · www.halfen.com
Vertical anchor-head placement
e
HSC
d
HSC
e
[mm]
HSC
10
20
20
25
c
The concrete cover specifi ed in the
drawing must also be maintained for
the stud heads.
Anchorage in columns:
The stud- heads are positioned behind
the rear longitudinal column reinforce-
ment.
Welding, even spot welding, can impair material properties. For that reason
welding and heat application in the head and thread area is not allowed.
Other welding, outside of this area has to be carried out according to applicable
welding regulations and is the sole responsibility of the welding-contractor.
Horizontal anchor-head placement
Variation 2: stacked HSC anchors
– minimized axial distances
a
[mm]
HSC
15
20
25
30
Assembly instructions
a
HSC
d
HSC
Attached to existing reinforcement,
e. g. by wire fi xing
3