Télécharger Imprimer la page

Riello MBC 1200/1 Manuel D'entretien page 54

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 32
4.6.1
Electrical wiring on burners with 6 pin plug-
socket
Train without valve leak detection control device
PG
2
3 1
20049384
4.6.2
Connections for burners with terminal board
Train without valve leak detection control device
PG
2
3 1
20049385
Remove the 6 pin plug and connect the gas train
according to the wiring diagram indicated in the
burner manual.
WARNING
In burners without electronic cam, the wires
V1 and V2 must be connected to the same ter-
minal.
WARNING
For the electrical wirings to the burner refer to
the instruction manual of said burner.
2916122
V
V 1
V 2
1
2 3
X 6
3 2 1 N
Ph
V
V 1
V 2
1
2 3
Installation
Train with valve leak detection control device
PG
2
3
1
V PS
L1
BU
N
B5
BK
T6
T7
T8
BN
X 6
Train with valve leak detection control device
PG
2
3
1
V PS
L1
BU
N
B5
BK
T6
T7
T8
BN
Key (Fig. 6 and Fig. 7)
PG
Min gas pressure switch
V
Valve group V1 - V2
X6
6 pin socket
VPS
Valve leak detection control device
BN
Brown
BU
Blue
BK
Black
YE
Yellow
9
GB
V
V1
V 2
1
2 3
3 2 1 N
Ph
V
V 1
V 2
1
2 3
Fig. 6
Fig. 7

Publicité

loading