Télécharger Imprimer la page

T&S B-0695 Instructions D'installation Et D'entretien page 4

Publicité

Les langues disponibles

Les langues disponibles

General Instructions
Installation: (Vacuum Breaker)
1. Drill holes 3-3/4" center-to-center in
wall where you will be installing no.1.
Note: Please consult applicable
plumbing codes for proper installed
height of no.1 over outlet of no.13.
2. Remove no.3 from no.1, install no.3
onto piping.
1
3
2
3. Reattach no.1 to no.3, making sure
no.2 is in place and tighten with a
wrench.
Installation: (Faucet Body)
4. After unpacking no.4, remove no.6,
no.7, no.8 and no.9 from no.5.
(Loosen no.8 at base of no.9, slide
both off no.5.)
9
wall
8
6
7
11
9
10
8
Use no.10 and no.11 for B-0695 ST
and B-0696 ST models
5. (For B-0695 ST and B-0696 ST
models, add no.10 by using no.11 to
join the couplings together.)
Make connections to no.4
B-0695: 1/2" IPS (Iron Pipe Size) female
union inlets; 1/2" close nipples.
B-0696: 5/8" union inlets; must solder
copper piping to inlets.
B-0695 ST: use B-0416 stops; 1/2" NPT
(National Pipe Thread) piping.
wall
B-0696 ST: installer must supply 5/8"
solder joint to 1/2" NPT (National Pipe
Thread) adapter in order to attach supply
outlet
lines to no.10.
Installation: Nozzle
6. Attach no.12, onto supply pipe;
inlet
screw no.15 into no.13 attachment.
15
13
7. Mark holes on wall for attachment
of no.16; use provided no.18 to
secure no.16 to wall.
8. Insert no.17 into hole of no.16.
5
16
i n l e t
17
15
9. Turn on water and check for leaks.
See flow diagram on page 8.
:
12
supply
l i n e
18

Publicité

loading