EN
One mixed zone
Schematic diagram
Use 3-wire mixing valves:
- OPENING PHASE 230V
- CLOSING PHASE 230V
- NEUTRAL.
with switching times (from all closed to all open) of not more than
180 seconds.
Electrical connections
After installation, carry out the necessary electrical connections as shown in the wiring diagram.
Then confi gure the controller as described in the specifi c section.
RY1
RY2
7 (L)
8 (N)
9 (L)
10 (N)
318a
318a
315a - A 315a - B 315a - C
318a
318a
315a - A 315a - B 315a - C
Key
72a 1st zone (mixed) room thermostat
138 External probe
139a 1st zone (mixed) Remote Timer Control
315a 1st zone (mixed) mixing valve
A = OPENING PHASE
B = NEUTRAL
C = CLOSING PHASE
To manage the sliding temperature it is necessary to purchase the external probe accessory code 013018X0
RY3
RY4
RY5
11 (L)
12 (L)
13 (L)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
C
B
A
317a
318a
315a
317a 1st zone (mixed) safety thermostat
318a 1st zone (mixed) circulating pump
319a 1st zone (mixed) delivery sensor
315a
M
317a
319a
318a
72a/139a
fi g. 12
RY6
RY7
RT1
14 (N)
15 (L)
16 (L)
19 - 20
72a/139a
72a/139a
FZ4B
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
fi g. 13
CONTROLLO ZONE FZ4B
CALDAIA
a
RT2
RT3
T1
21 - 22
23 - 24
25 - 26
27 - 28
319a
319a
72a
319a 138
139a
IMPIANTO
a 1st zone (mixed)
____ Necessary wiring
- - - - Optional wiring
T2
T3
T4
29 - 30
30 - 31
138
71