Télécharger Imprimer la page

Uberhaus 38115139 Guide De L'utilisateur page 6

Abri-soleil 10 x 10 pi

Publicité

Les langues disponibles

Les langues disponibles

Hardware Pack 2
Part
BB
EE
FF
Fig.5: Insert the slanted beam (F1) into the lower tube (G1).
Fig.6: Insert the top end of the slanted beam into the top connector (I1), then assemble the hook (K) on the top connector.
Fig.6-1: Secure the assembled the slanted beam to the post with flat washers (BB) and nuts (FF).
middle beam 1
Fig.7: Insert the
Fig.7-1: Insert the top end of the middle beam 1 (D1) into the top connector (I1).
Fig.8: Secure the middle beam 2 (D2) to the connector (E) with bolts (EE), flat washers (BB) and nuts (FF).
Fig.9: Slide large canopy (O1) over the roof structure, but do not extend it fully at this stage. Insert the small slanted
beam (H1) into the small connector (J1).
Description
M6 Flat washer
M6 x 35 Bolt
M6 Nut
middle beam
(D1) into the
Quantity
16P CS
8 PCS
8 PCS
2 (D2).
6
Image

Publicité

loading