Electrical installation
Power supply
Circuit breaker
RCCB
Pre-Installation
> Installing a permanent power supply line:
Install separate circuit breaker and residual-current
circuit breaker (RCCB) upstream
Connect all pole disconnector mains switch upstream
located outside specified protection zones (0 - 2)
Leave 3 000 mm of feed cable exposed
> Lay equipotential bonding cables:
leave 3 000 mm of cable exposed
NOTICE
First install the bathtub and connect the waste water and
then carry out the electrical installation.
I
Connecting the LED white light
Avoiding any malfunctions!
NOTICE
Do not fasten the cables together with cable ties.
Do not install the supply line parallel to the control
cables.
> Connect the supply line to the mains supply socket.
II
Connecting the potential equalisation
Connect the potential equalisation cable to the bathtub
support frame.
50/60 Hz, 220 - 240 V AC
I
= 16 A
N
I
30 mA
N
Safety areas in accordance with DIN VDE 0100-701
0
6 0
1
0
I
II
6 0
0
* or the height
2
of the highest
shower head /
water outlet that
is permanently
installed,
depending on
which is higher
ZU_M_LED white light below the bathtub edge/15.09.3
7