Télécharger Imprimer la page

Flotec FP7100 Notice D'utilisation page 3

Masquer les pouces Voir aussi pour FP7100:

Publicité

Les langues disponibles

Les langues disponibles

General Information
GENERAL INFORMATION
Tanks listed below are pre-charged, or filled with
air at the factory, to 40 pounds per square inch
(PSI) (276kPa). When installing tank, set tank pres-
sure according to Chart 1. To do this, bleed air from
or add air to tank through valve on top of tank.
NOTICE: Always set or check tank pre-charge with
NO WATER in tank or water pressure in system. If
you have already pumped water before setting or
checking pre-charge pressure, turn pump off. Open
faucet until there is no more water pressure. Set
pre-charge in tank according to Chart 1, then close
faucet and turn pump back on.
NOTICE: Replace and tighten air valve cap after
pressure is adjusted correctly. Failure to replace air
cap may allow loss of air pressure and lead to tank
waterlogging and bladder failure.
CHART I
When Pressure Switch
Setting Is
20-40 PSI (138-276 kPa)
30-50 PSI (207-345 kPa)
40-60 PSI (276-414 kPa)
(The first number on the pressure switch is the
pump on setting; the second number is the pump
off setting.)
Pre-charged storage tanks can be connected togeth-
er to increase the drawdown. Drawdown is the
actual amount of usable water available from when
the tank is full to when the pump turns on.
Installing two tanks of same size will double the
drawdown supply, three tanks will triple the draw-
down supply, (Figure 1). Locate pressure switch as
shown. Tank and pressure switch cannot be more
than 10' (3M) apart.
From well
Figure 1
NOTICE: Tank capacity is different than drawdown.
Tank capacity is the actual physical volume of the
sheet metal that makes up the tank.
For parts or assistance, call Flotec Customer Service at
Reduce Tank
Precharge (PSI) To
18 (124 kPa)
28 (193 kPa)
38 (262 kPa)
Tanks
Pressure
switch
To service
909 0993
OPERATING CYCLE
Step 1. Tank nearly empty – air expands filling area
above bladder (Figure A).
Step 2. Water enters tank – air is compressed
above bladder as it fills with water
(Figure B).
Step 3. Pump-up cycle completed – air compressed
to OFF setting of pressure switch (Figure C).
Step 4. Water drawn from tank – compressed tank
air forces water out of bladder (Figure D).
Step 5. Bladder empty – new cycle ready to begin
(Figure A).
A
C
WATER
Figure 2
INSTALLATION
Connect discharge pipe from pump to a tee.
Connect one side of tee to tank flange and the
other side of tee to service. Use plastic or steel pipe
as required. To prevent leaks, use Teflon tape or
Plasto-Joint Stik
1
on male threads of all threaded
connections to tank.
NOTICE: To be sure pipe joints are not cross-
threaded and all threads are clean, make connec-
tions by hand (without sealer) first. When threads
are clean, remove pipe, add Teflon tape or Plasto-
Joint Stik, and remake connection. Tighten by hand
first; finish with pipe wrench.
When installing an elbow or nipple in the plastic
tank flange, tighten it hand tight plus 1-1/2 turns
with a pipe wrench. DO NOT OVERTIGHTEN!
Standard Tank Replacement
When replacing standard tank in a water system
with pre-charged tank, no bleeder orifices or Air
Volume Control (AVC) are required. When sizing a
pre-charged tank to replace a standard tank, the
tanks should have equivilant drawdowns. For
example, model FP7110T precharged tank has a
drawdown of 5.8 gallons (22L) and is equivalent to
a 42 gallon standard tank that has a drawdown of
4.3 gallons (16.3L).
1
Lake Chemical Co., Chicago, Illinois
(FIGURE 2)
B
WATER
D
WATER
1-800-365-6832
3

Publicité

loading

Ce manuel est également adapté pour:

Fp7100hFp7110Fp7110tFp7110thFp7120Fp7125 ... Afficher tout