Step 3.
Install the 9800 FlexFit plug
Reset button
Test button
Ground-fault
unit
3A. Prepare the cable
Cleanly cut off the end of the cable. Push back
the braid 3/4 in (2 cm) and then twist the end
of the braid around the cable to ensure the
braid strands are not sticking up.
Note: The clear plastic wrap does not
need to be removed.
3B. Insert the cable
Insert the heating cable all the way into the
cable guide until the cable hits the back wall.
Be sure no braid wire strands enter cable guide.
Indicator
light
3/4 in
(2 cm)
Back wall
Cable guide
Ground contact
3C. Complete the connection
Screw down the cable guide, alternating
between the two screws, until the cable guide
is flush with the indicator posts and the
screws bottom out.
3D. Install the cover
Install the cover by tightening the screws
completely.
Note: The screws will require many turns
before the cover starts to close.
Cover
Back wall
Indicator post
Indicator
post
nVent.com/RAYCHEM
|
7