Sequence Of Operation; Séquence Du Fonctionnement - Prest-O-Lite 250 Manuel D'instructions, D'installation, D'utilisation Et D'entretien

Table des Matières

Publicité

SECTION 5
5.3

SEQUENCE OF OPErATION

TORCH SWITCH
GAS SOLENOID VALVE
FLOW SWITCH
FAULT OVERLOAD LIGHT
HF CIRCUIT
INVERTER
CUTTING ARC (CURRENT)
NOTES:
1.
When the torch switch is depressed during postflow period, the postflow and preflow times are canceled,
and the HF is energized immediately. The postflow time starts from the moment the torch switch is
released.
PUSH
OPEN
2
SECONDS
PREFLOW
CLOSE
ENERGIZE
34
TrOUBlESHOOTING
RELEASE
CLOSE
10-14 SEC-
ONDS
Postflow
OPEN

Publicité

Table des Matières
loading

Table des Matières