T&S B-0870 Série Instructions D'installation Et D'entretien page 5

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

General Instructions
5. Replace pop-up drain stopper in drain body, with 'o'-ring in place,
and align stopper hole with guide and opening.
6. Reinsert rod ball assembly
back into drain body and
through hole in drain stopper.
7. Insert pop-up stem through
hole in faucet body. Attach lift
rod to pop-up stem by
inserting stem through hole in
lift rod. Reassemble rod
guide, washer and nut, and
tighten firmly.
drain
body
rod/ball
assembly
rod guide
washer
and nut
9. Make connection to supply
lines.
10. Turn on water supply and
check for leaks.
flange
align hole in
drain stopper
with guide rod
opening
(pointed toward
back wall)
pop-up
stem
8. Adjust pop-up stem to correct
height by opening drain, and sliding lift
rod and rod clip at the same time onto
rod/ball assembly. Readjust lift rod
screw if necessary, hand-tighten.
Side view
faucet and
pop-up
assembly
drain
stopper
sink
drain
body

Publicité

Table des Matières
loading

Table des Matières