Welcome
Thank you for choosing Cisco Business Edition 7000M. This guide describes how to install the
server and prepare it for configuration. Detailed instructions on how to install the applications,
configure the features, and connect the devices is provided online. See the Where to Go from
Here section for details.
Package Contents
Before you unpack the server, verify that all of the following items are present. If any item is
missing or appears to be damaged, contact your supplier immediately.
Cisco UCS C240 M4S2 Server
Rack‐mounting kit
Power cords (2)
KVM adaptor
Ethernet cables
Console cable
Cisco Virtualization Hypervisor license pack
Cisco Business Edition 7000M Quick Start Guide (this document)
Note:
Record and store the Cisco Virtualization Hypervisor license key in a safe place.
This key will be required if the product needs to be reactivated in the future.
Before You Begin
Ensure that you have the following before you unpack the server:
Space in a standard 19‐inch equipment rack (2 RU) for each server
110 / 220 VAC power feeds
VGA monitor and USB keyboard (not supplied) – for initial installation only
Ethernet network port or ports configured for the server connection
For Your Safety!
Before you work on any equipment, be aware of the hazards that are involved with electrical
circuitry and be familiar with standard practices for preventing accidents.