Mounting and commissioning
14
Drill holes (Ø 10 mm) at the position of the two marks and
3.
insert the enclosed dowels. Screw the long hanger bolt in-
to the top hole, the short hanger bolt into the bottom hole.
Fit
4.
with a washer and a nut.
Connect the pipes of the solar circuit to the connections of
5.
the fittings.
Refit the upper insulation.
6.
Fig. 3: Mounting
with the bottom insulation and secure it