TooQ TQEP-500SSE-O Guide De L'utilisateur page 10

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Basic guidelines for installation and started:
1. Following the instructions on the PC case, open it and remove the previous power
supply by disconnecting all the connections and removing the screws that secure the
power supply to the PC. Then place the new power supply in the same place.
2. Locate and connect the ATX, 20 or 20+4 pin main connector on the motherboard. If the
motherboard has only 20 pins, separate the additional 4 pins.
3. Perform the same process with the secondary cable that supplies an additional 12V.
This cable usually has 8 pins (4 + 4), but only four may be required depending on the
type of motherboard.
4. Connect each of the hard drives and optical drives using the SATA or MOLEX
connectors provided for them. Keep in mind that each device requires its power and
data cable to be connected.
5. Once the installation is complete, connect the power cord to the power and set the
switch to "I" position, then turn on the computer.
Warranty:
TooQ offers a 24 months warranty from the time of purchase, so it is necessary to
have the ticket or invoice where the date appears. The distributor or seller where you
purchased this product will respond to your claim and offer your technical service
while the warranty is in effect.
Out of warranty:
The warranty does not cover damage or defects caused to the power
supply due to:
10

Publicité

Table des Matières
loading

Table des Matières