dirna Bergstrom bycool green line COMPACT 3.0 Instructions De Montage page 22

Masquer les pouces Voir aussi pour bycool green line COMPACT 3.0:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

COMPACT 3.0
EN
Position the air distribution panel on the front
10
studs with (1) M6 wide-rim washer and (1) M6
nut on each stud. Tighten the nuts until the air
distribution panel duct comes up against the air
duct top side in the unit.
Important: The foam duct must come up
against the upper foam in the unit in order to
prevent any leakages of air.
10
EPDM
Gasket
Cabin roof
Upholstey
Tighten the nut in point 9a until it comes up
11
against the top part of the interior air distribution
panel.
11
EPDM
Gasket
Cabin roof
Upholstey
Unit base
D
Nut M6
Stud M6
Unit base
Nut M6 (9a)
Nut M6
Stud M6
Interior air distribution panel
Interior air distribution panel
22
Foam
Foam
®

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bycool green line compact 1.4 volvo

Table des Matières