Installing Overhead Gearloft™ Storage Rack
1.
Attach the EZ connect supports
Using two or more people, the rack system can be easily lifted
and positioned overhead. The EZ connect feature allows for
positioning 23" to 37" from the ceiling. Lift the rack into place and
connect all 6 lower supports to the upper supports. Make sure
the rack supports are all in the same position and the rack is level.
WARNING
Excessive Weight Hazard
Use two or more people to move storage rack.
Failure to do so can result in back or other injury.
2.
Complete the assembly
P2
P5
P6
Make sure all bolts and screws are tight. Once the rack is in the
desired location below the ceiling, place an EZ connect lock pin
(F5) (6) in a hole on each of the corner and center supports to
lock/retain them together. The pins go through both upper and
lower supports.
NOTE : The rack system can be repositioned up or down by
removing all lock pins and relocating the EZ connect position on
the supports. Use two or more people to relocate the rack and
replace the EZ connect lock pins (F5) (6).
F5
F5
EZ Connect lock pin
9