COMPACT 3.0
Tighten (4) M8 nuts to Unit base and (4) to
16
support.
3-6mm.
Cabin roof
Fasten selflocked nut until
16
EPDM gasket is compressed
between 3 and 6 mm.
17
Tighten
the
channelling equipment fits together correctly.
Tighten nuts of the point 10 until touch with
18
the top part of the front.
18
EPDM
Gasket
Cabin roof
Upholstey
EPDM gasket
A
(*) (approx. after tightening)
Hexagon
pieces
Unit base
nut M6 (10)
Stud M6
1mm.
B
C
10 mm*
until
the
(D)
Air ducts
23
Air conditioning for vehicles
B
A
Foam Gasket
front with louvers
EN
C
16
17