Installation And Connection; Electrical Connection - Simu 2008778 Notice Originale

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION AND CONNECTION

4
4.1 Wall drilling and fixing the box
Pass power cable
+ ground-wire
The box can be mounted horizontally or vertically
Please follow the following steps to ensure proper installation:
1 - Mark the position of the holes using the scale template (Appendix 1) and drill.
2 - Remove the two screws provided with the support of the switch. (cf ⑦)
3 - Pass the declutching cable through the hole (see photo above). Ensure that the flexible sheath is well supported on the bottom of
the box.
4 - Pass the ground wire and power cables.
5 - Set the declutching box to the wall with the appropriate fasteners.

4.2 Electrical connection

1- Connect the ground wire to the screw provided for this purpose (see number ⑩ on the bottom of the box)
2 - Remove the switch from its support.
3 - Place the power cables through the bracket.
vertically
Hole of Ø5 for fixing
the box
Ø17 for passing the
declutching cable with
sheath
horizontally
3 /6
44
13

Publicité

Table des Matières
loading

Table des Matières