4.3 Accessories Installation
Anti-vibration bases
1. Take out 4 Anti-vibration
bases
2. Put them one by one on the
bottom of machine like the
picture.
Draining jet
1. Install the draining jet under
the bottom panel
2. Connect with a water pipe to
drain out the water.
Note: Lift the heat pump to
install the jet. Never overturn the
heat pump, it could damage the
compressor.
Water Inlet & outlet junction
1. Use the pipe tape to connect
the water Inlet & outlet junction
onto the heat pump
2. Install the two joints like the
picture shows
3. Screw them onto the water
Inlet & outlet junction
Cable wiring
1. Connect the power supply
wire through the white hole like
the picture shows.
2. Fix the other side on joints
inside the electric box.
Water pump wiring
1. With the connector 1 and 2
you can pilot the water filtration
through the timer of the filtration
(dry contact)
- 59 -