Commissioning, Measuring, Calibration - SI Analytics BlueLine IDS Série Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Commissioning, measuring, calibration

Smallest allowed bend radius
Commissioning
14
Connection cabel
Diameter
Plug type
Accuracy of the IDS measuring technique
Measured parameter
pH
U [mV]
T [°C]
Commissioning, measuring, calibration
Prepare the electrode for measuring as follows:
Remove the watering cap from the electrode tip. Possible salt deposits in
the area of the watering cap do not affect the measuring characteristics
and can easily be removed with deionized water.
Only BlueLine 14 pH IDS:
Open the refi lling opening for the reference electrolyte solution
refi lling opening
The refi lling opening must always be open during calibration and
Measurement!
4,3 mm
Fixed installation: 20 mm
Flexible use:60 mm
Socket, 4 pins
Accuracy (± 1 digit)
± 0.004
± 0,2
± 0.1
T 814251
BlueLine
05/2014

Publicité

Table des Matières
loading

Table des Matières