Télécharger Imprimer la page

CRH Leviat HALFEN FRIMEDA TPA-R Notice D'utilisation page 4

Lifting anchor ring clutches

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 10
HALFEN FRIMEDA TPA-R
1. Engaging
2. Lifting
correct
correct
3. Tilting slabs without tilting table
4. Releasing
4
correct
correct
Insert the ring clutch into the recess
of the concrete and close the locking
bolt (slide) manually, pushing it to the
limit position. Then start the lifting
operation.
correct
The ring clutch can be subjected to
loads in any direction (do not exceed
the load limits of the anchors!).
Angled pull of up to 60° using a
spreader beam is permissible.
correct
The HALFEN FRIMEDA Rapid lift
system can be used to move fl at-cast
precast units from a horizontal to a
vertical position. The direction of pull
is at 90° to the cast-in anchor.
To avoid the concrete spalling, the
erection anchor TPA-FA should be
properly embedded in the unit.
Push the bolt back by hand; the ring
clutch can now be removed.
© 2021 · INST_TPA-R 08/15 · www.halfen.com
Assembly Instructions

Publicité

loading

Produits Connexes pour CRH Leviat HALFEN FRIMEDA TPA-R