POWER SUPPLY
►
230 volts +/-10% 50/60Hz ou poE, poE +
►
Maximum consumption 5vA
►
Fuse inside, behind the socket 230. (optional 230vAC on cable: fuse on rear panel)
SYNCHRONISaTION INPUT
►
Seconds colon extinction: 5 seconds without synchronization.
►
ntp synchronization source: UtC (Coordinated Universal time).
☛
For more information, please consult the NTP version user manual
26
«NTP-option-LEDI-LEDIWORLD-HANDI»
and the configuration tool user manual
«GT NETWORK MANAGER»
included in the DVD CDG020 shipped with the clock.
6. CHaRaCTERISTICS
MDE-LEDI-2S-NTP-1108V1.0