HYDRUS
Avoid the collection of air bubbles in the meter during the installation
process.
HYDRUS is approved according to EMC class E2. We recommend to install
the meter sufficiently far away from possible sources of electric field.
HYDRUS must not be installed with offset pipe ends.
Calming sections before and after the meter are not necessary.
The meter must not be under any mechanical stress when installed
in the pipeline.
The meter must be fitted so that is protected against all outside impu-
rities and contamination.
Remove old gaskets and clean gasket faces.
Thinly grease gasket faces (use acid-free, potable-water approved grease).
-18-
Deutsch
English
Français
Português