Operation Introduction - Elnur Gabarron BERING 12000 Instructions D'installation Et Guide D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6. Operation Introduction

Before starting operations in this section:
1. Find a place where there is power supply nearby.
2. As shown in Fig.5 and Fig.5a, install the exhaust hose, and adjust the window position well.
Fig. 5
Fig. 5a
3. As shown in Fig. 6, connect drain hose well
4. Insert the power cord into an grounded AC220~240V/50Hz socket;
5. Press the POWER button to turn on the air-conditioner.
Dranaige outlet
Fig. 6
22

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bering 9000

Table des Matières