Maintenance Schedule - Ryobi RY907000FI Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STORAGE
When preparing the generator for storage, allow the unit to cool for 30 minutes then follow the guidelines below.
STORAGE TIME
Less than 2 months
 Drain gasoline from tank and dispose of in a suitable container according to state and local ordinances.
2 months to 1 year
 Drain gasoline from tank and dispose of in a suitable container according to state and local ordinances.
1 year or more
 Remove spark plug.
 Drain gasoline from tank and dispose of in a suitable container according to state and local ordinances.
 Put a tablespoon of engine lubricant into the spark plug cylinder. Turn the engine slowly with the pull
 Reinstall spark plug.
 Change engine lubricant.
After removal from storage:
 Fill with fresh gasoline.
NOTE: If storing gasoline in suitable container for later use, make sure gasoline has been treated with fuel stabilizer
according to stabilizer manufacturer's instructions.

MAINTENANCE SCHEDULE

NOTE: If a separate engine manual is provided for this generator, please follow the maintenance schedule provided in the engine
manual instead of the maintenance information listed below.
Before
each
use
Check Engine
Lubricant
Change Engine
Lubricant
2
Check Air Filter
Change Air Filter
2
Check/Adjust
Spark Plug
Replace Spark
Plug
2
Check/Clean
Spark Screen
Check/Adjust
Idle Speed
Check/
Adjust Valve
Clearance
1,2
Check/Adjust
Head Bolt
Torque
1,2
Fuel Filter
Inspect
Recharge Battery
(if equipped)
1. These items should only be carried out by a qualified service center.
2. See engine manual for maintenance schedule for this item.
NOTE: Maintenance should be performed more frequently when generator is used in dusty areas.
When generator has exceeded the maximum figures specified in the table, maintenance should still be cycled according to
the intervals of time or hours stated herein.
MAINTENANCE
rope to distribute the lubricant.
After 1st
Every 100
month or
hours of
25 hours of
operation
operation
PRIOR TO STORING
Every 200
Every 240
Every 300
hours of
hours of
hours of
operation
operation
operation
Replace
18 — English
Every 400
Every 480
hours of
hours of
operation
operation
Every 500
hours of
operation

Publicité

Table des Matières
loading

Table des Matières