DESCRIPTION DE L’ETAT DES VOYANTS / CODES ERREURS LAMP STATUS / ERROR CODES DESCRIPTION Si au démarrage du produit If when the product starts up Suivre procédure d’étalonnage p.3 Follow the steps of the calibration process p.3 SEB INTERNATIONAL SERVICE March 2019...
Page 3
PROCEDURE D’ETALONNAGE CALIBRATION PROCESS A réaliser après chaque intervention. Should be done after any repair. Conditions initiales / Initial conditions Etalonnage / Calibration SEB INTERNATIONAL SERVICE March 2019...
Page 4
PROCEDURE D’ETALONNAGE CALIBRATION PROCESS 3 sec 3 sec TO–CY9924 SEB INTERNATIONAL SERVICE March 2019...
Page 5
PROCEDURE D’ETALONNAGE CALIBRATION PROCESS 3 sec 3 sec SEB INTERNATIONAL SERVICE March 2019...
Page 6
PROCEDURE DE TEST TEST PROCESS Suivant la version du programme, certains voyants peuvent être allumés. Depending the software version, some ligthts could be illuminated. 3 sec TO–CY9924 3 sec SEB INTERNATIONAL SERVICE March 2019...
Page 7
Suivant la version du programme, certains voyants peuvent être allumés. Depending the software version, some ligthts could be illuminated. 3 sec Suivant la version du programme, certains voyants peuvent être allumés. Depending the software version, some ligthts could be illuminated. SEB INTERNATIONAL SERVICE March 2019...
Page 8
Depending the software version, some ligthts could be illuminated. Suivant la version du programme, certains voyants peuvent être allumés. Depending the software version, some ligthts could be illuminated. FIN DE LA PROCEDURE DE TEST / END OF TEST PROCESS SEB INTERNATIONAL SERVICE March 2019...
Page 9
TEST DE CHAUFFE HEAT TEST Matériel nécessaire Test equipment Un lecteur de température A temperature reader SEB INTERNATIONAL SERVICE March 2019...
Page 10
➔ Wait preheat ➔ Attendre que le voyant passe au rouge pour prendre la mesure de la température. ➔ Wait until the light is red fixed color to measure the temperature. 250°C ≤ T ≤ 280°C SEB INTERNATIONAL SERVICE March 2019...
Page 11
SCHEMA DE CABLAGE WIRING PLAN SEB INTERNATIONAL SERVICE March 2019...
Page 12
Remove the sensor from the spare part by unscrewing the 3 srews. Retirer le cache charniére en enlevant les 6 vis. Remove the hinge cover by unscrewing the 6 screws. Enlever la plaque inférieure. Remove the lower plate. SEB INTERNATIONAL SERVICE March 2019...
Page 13
Remove the reflector by pressing on the unlock system. Retirer les trois colliers plastiques. Cut and remove the plastic straps (X3). Déconnecter les 6 fils. Disconnect the wires (X 6). SEB INTERNATIONAL SERVICE March 2019...
Page 14
Unscrew the lower reflector (7 screws). Ouvrir le capot du pied (3 vis). Open the foot lid (3 screws). Ouvrir le capot. Move the lid. Démonter le capteur (3 vis). Remove the sensor (3 screws). SEB INTERNATIONAL SERVICE March 2019...
Page 15
WARNING ➔ The black lever must be placed over the potentiometer white arm. Répéter les étapes 10-9-8-7-6-5-4- 3 en sens inverse. Redo the steps 10-9-8-7-6-5-4-3 on the reverse way. Faire un étalonnage. Perform a calibration. SEB INTERNATIONAL SERVICE March 2019...